ECONEST

You are here

A NEW GENUS OF SERVICED APARTMENTS

A private low-density sanctuary perched high up in the clear azure sky of the city of Nusajaya, and lavished with a city of urban luxuries and modern amenities enveloped by weaves of comfort and warmth.

A NEST IN A CITY

Nestled in the heart of Nusajaya city, Iskandar Malaysia, EcoNest is adjacent to EduCity - a prime destination for first-class education - and easily accessible via major highways. Its outstanding location puts it in the vicinity of prominent places down south, including Johor Bahru city centre, Singapore, and many more.

A CITY IN A NEST

EcoNest is designed with an exuberance of urban indulgences, such as premium facilities, classy boutiques, posh retailers, and chic offices, bringing the finest of eco and luxury living to your doorstep.

PLEASURE AT YOUR LEISURE

Living in EcoNest is living among many of life's pleasures.

Immerse yourself in the calm waters of the 50m lap pool.

Workout with world-class equipments at the gymnasium.

Play your game at a new plane of enjoyment with premium sporting facilities.

You will always have an exuberance of superb amenities at your disposal, for you to indulge yourself with at your leisure.

24/7 INDULGENCE

Float your mind to serenity on a hanging hammock.

Unwind beneath the shades of the pavilion.

A day at EcoNest is designed to be filled with indulging experiences. The experience of relaxation at greater heights. The experience of luxury at a whole new level. The Experience of harvesting your own spices. With its myriad of first-class experiences here, indulgence never takes a day off.

Construction Progress Milestone

20%
Instalments Payable%Estimated Dates (Subject To Change)
1. Immediately upon the signing of the Sale and Purchase Agreement10DUE
2. Within twenty – one (21) working days after receipt by the Purchaser of the Vendor’s written notice of the completion of -
(a) The work below ground level of the said Building comprising the said Parcel including foundation of the said Building10DUE
(b) The structural framework of the said Parcel 15DUE
(c) The walls of the said Parcel with door and window frames placed in position 10SEPT, 2016
(d) The roofing, electrical wiring, plumbing (without fittings), gas piping (if any) and internal telephone trunking and cabling to the said Parcel 10NOV, 2016
(e) The internal and external finishes of the said Parcel including the wall finishes 10JAN, 2017
(f) The sewerage works serving the said Building5MAR, 2017
(g) The drains serving the said Building 5MAY, 2017
(h) The roads serving the said Building5JULY, 2017
3. On the date the Purchaser takes vacant possession of the said Parcel with water and electricity supply ready for connection 20NOV, 2017

2016-07

2016-05

2016-02

2015-11

2015-08

2015-06

2015-02

Doors: 
Main entrance Fire-rated door
All Bedrooms / Bathrooms / Utility Plywood flush door
Balcony Aluminium framed galss sliding door

 

Ironmongery: 
Quality locksets

 

Wall Finishes and Painting: 
Kitchen 500 mm height wall tiles where applicable to kitchen
Bathrooms Full height wall tiles till ceiling level

 

Floor Finishes and Staircase finishes: 
  All Type
Living/dining/Kitchen  Porcelain Tiles
Bedrooms Porcelain Tiles
Bathrooms Porcelain Tiles
Balcony / Yard /Utility Porcelain Tiles
Other areas Cement render

 

Sanitary and Plumbing Fittings: 
  A    B   C   D   E   F   G   H   S2
Kitchen sink  1 1 1 1 1 1 1 1 1
Wash basin 1 1 2 2 2 3 3 2 2
Toilet roll holder 1 1 2 2 2 3 3 2 2
Soap Holder 1 1 2 2 2 3 3 2 2
Shower rose 1 1 2 2 2 3 3 2 2
W.C 1 1 2 2 2 3 3 2 2

 

Electrical Installations: 
  A B   C   D   E   F   G   H   S2
Lighting point 9      9 15 15 16 18 21 14 16
Power point 17 17 20 20 22 22 25 19 22
Ceiling Fan point 3 3 4 4 4 4 5 3 3
TV/Astro Point  2 2 2 3 2 3 3 2 2
Water Heater Point 1 1 2 2 2 3 3 2 2
Air Cond Point 2 2 3 4 4 4 5 3 3
Door Bell Point 1 1 1 1 1 1 1 1  

 

Internal Telephone Trunking and Cabling: 
A   B   C   D   E   F   G   H   S2
1 1 1 1 1 1 1 1 1

 

Fencing: 
N/A

 

Turfing: 
N/A

 

Gas piping: 
N/A

 

 

 

Note : 

The Vendor shall as its own cost and expense install or construct all of the items listed above in accordance to the description set out save for the item or items marked with an * which may be deleted if not applicable.