SK1 COMMERCIAL CENTRE

SK 1 Commercial Centre @ Sime Darby Business Park - Most Innovative Commercial & Industrial Development!
FREEHOLD 11.26 acres of land comprise 81 units of 3 Storeys shop lot with built up sizes ranging approx. from 4458 sq ft. to 8312 sq ft and ample parking lots!

UNLIMITED POTENTIAL For Lucrative Returns

  • 3 Story Shop Office
  • Attractive & inviting modern facade
  • Iskandar Malaysia - Flagship D's most anticipated Commercial Centre
  • Surrounded by matured residential neighborhoods & more than 300 factories in the Pasir Gudang area
  • Easy access to major highways - Senai Desaru Highway, Pasir Gudang Highway & Coastal Highway
     

PLOT 5
Lot Size: 22' x 70' (Intermediate Lot)
Built-up-area: From 4,457 sq. ft. onwards

PLOT 6
Lot Size: 22' x 70' (Intermediate Lot)
Built-up-area: From 4,457 sq. ft. onwards

Instalments Payable%Estimated Dates (Subject To Change Based on Actual Billings)
1. Immediately upon the signing of the Sale and Purchase Agreement10DUE
2. Within fourteen (14) days from the date of the Vendor’s written notice of the completion of:
(a) earthworks of the said Building10MAR’16
(b) piling works of the said Building10MAY’16
(c) footing/pile cap works of the said Building10MAY’16
(d) reinforced concrete framework for the ground floor of the said Building – Ground Floor Beam & Slab10MAY’16
(e) reinforced concrete framework for the 1st floor of the said Building – 1st Floor Beam & Slab10JAN’17
(f) reinforced concrete framework for the 2nd floor of the said Building – 2nd Floor Beam & Slab10APR’17
(g) walls for the ground floor of the said Building with doors and window frames placed in position2.5NOV’17
(h) walls for the 1st floor of the said Building with doors and window frames placed in position2.5NOV’17
(i) walls for the 2nd floor of the said Building with doors and window frames placed in position2.5NOV’17
(j) roofing of the said Building2.5NOV’17
(k) electricity wiring and plumbing works (without fittings) of the said Building5NOV’17
(l) internal and external plastering of the said Building5JAN’18
(m) drains, roads and sewer serving the said Building5DEC’17
3. On handing over of vacant possession of the said Building5DEC’17